EEP d.o.o. | Partizanska 70 | SI - 6210 Sežana | Slovenia

European engineering project

Projects

Automated container warehouse for the Munich opera

Public buildings

Location: Poing, Germany

Designing period: 2020 - 2023

Client: Riko LTD

Type of structure: high racking steel structure

Service performed: Construction Plan in the Design for Building Permit (PGD), Design for Execution (PZI) project stages and Project documentation of completed works (PID)

Engineering methodology used: BIM with Autodesk Revit